91ÖÆƬ³§

Skip to main content

Vakhsh River System Operators From Tajikistan Train at CADSWES, 2016

reservoir formed by the dam on the Vakhsh River

Two river system operation professionals from Barqi Tojik, the agency that operates the Vakhsh River, and a project manager from Manitoba Hydro International trained at CADSWES, July 25–29, 2016. They arranged a private class to learn how to use RiverWare for operating their system and began to develop a model that incorporates their operating policies and maximize their time in the U.S. The Nurek Dam is where the hydroelectric station generates its power.